post

Access Road to Seymareh

Access Road to Seymareh

The scope of works for this contract includes all civil and related tasks in order to construct the access road of the Seymareh hydro power plant.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Iran Power and Water Development Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 15 million USD
Project Duration: 20 months

 

Featured Images

Project Volumes

Embankment: 300,000 m3
Excavation: 1,200,000 m3 (In Rock)
Masonry: 30,000 m3

Project Specification

Length of Road: 10.7 km
Width of Road: 15 m
Bridges & Walls: 30 Nos.

Project Goals

  • Providing the possibility of accessing to the main site of the Seymareh Hydropower plant

Project Stakeholders

post

Isfahan 230 KV Cable Tunnel

Isfahan 230 KV Cable Tunnel

Description of ProjectThe contract of this project consists of designing and construction of 230 KV cable tunnel located between Isfahan university and Taleghani post with total length of 4,600 m. Designing and construction of this project includes tunnel construction with ventilation shaft of inauguration time, procurement, delivery, erection and operation of the electrical and mechanical equipment’s of inauguration time that will be done by contractor. It was concluded to implement a TBM due to high speed and great performance of this machine, critical location of the project in addition to traffic congestion problems. Parhoon Tarh Co. is responsible for all related works in a framework of an EPC contract, which was awarded to Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Isfahan Regional Power Company
Consultant Engineer: Farbar Consulting Engineers
Location: Iran-Isfahan Province
Project Cost: 27 Million Euro
Project Duration: 30 months

 

Featured Images

Project Volumes

Concrete Volume: 11,000 m3
Reinforcement & Steel Works: 1,200 tons
Formwork: 43,000 m2
Excavation: 40,000 m3

Project Specification

Length of Tunnel: 4.6 km
Tunnel outer Diameter: 3.00 m
Tunnel inner Diameter: 2.44 m

Project Goals

  • Power transmission network of Isfahan
  • Carrying 230 KV cables from the first Islam Abad power plant

Project Stakeholders

post

Malard Residential Complex

Malard Residential Complex

Malard residential complex project is located in a land with area of 76,000 m2 on the opposite side of Malard municipality. First phase of this complex is designed in 6 diverse blocks. This company as an EPC contractor has utilized tunnel form working system for its high speed performance in order to industrialize the concrete frame of residential buildings. In this method, the load bearing shear walls of each story are poured simultaneously with the roof of the floor. High speed and easy performance are the major benefits of this method in comparison with classic ones. Parhoon Tarh Co. is responsible for architectural and structural design as well as execution of all civil, mechanical, and electrical works.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor
Client: Omran & Maskan Sazeh Paydar (Mehr Derakhshan) Co.
Consultant Engineer: Ateck & Tavan J.V.
Location: Iran-Alborz Province
Project Cost: 65 million USD
Project Duration: 22 months

 

Featured Images

Project Volumes

Concrete Volume: 80,000 m3
Reinforcement: 7,000 tons
Formwork: 492,000 m2

Project Specification

Total Area of Buildings: 140,000 m2
Capacity: 1272 units
Number of Blocks: 25
Number of Floors: 5 to 11

Project Goals

  • Provision of living accommodation

Project Stakeholders

post

Seymareh Hydroelectric Plant

Seymareh Hydroelectric Plant

Seymareh dam & hydropower plant project is located on the Seymareh River in western Iran, 37 km from the city of Darreh Shahr in Ilam province. The surface power house, with an annual energy production of 595 GWhr, was awarded by the Iran Water and Power Development Company to the consortium of Farab-Tablieh-Parhoon Tarh as the EPC contractor of civil parts. The design works were carried out by the Swiss Firm Poyry as a subcontractor of Tablieh-Parhoon Tarh J.V.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Tablieh-Parhoon Tarh J.V.
Client: Iran Power and Water Development Company
Consultant Engineer: Mahab Ghods Consulting Engineers
Location: Iran-Ilam Province
Project Cost: 42 million USD
Project Duration: 103 months

 

Featured Images

Project Volumes

Open Air Excavation: 60,000 m3
Concrete Volume: 70,000 m3
Reinforcement: 3,500 tons
Formwork: 48,000 m2

Project Specification

Type of Power House: Surface
Power House Dimensions: L= 97.70 m, W= 51.65 m, H= 57.15 m
Number of Units: 3 vertical axes 160 MW Francis units

Project Goals

  • Production of 850 G WHr hydroelectric energy annually
  • Control of seymareh river flood
  • Regulating water flow to Karkheh dam
  • Supply of regional downstream water requirements

Project Stakeholders

post

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Mes Sarcheshmeh WTP Diversion Dam & Pumping Station

Industrial water partial demand of Mes Sarcheshmeh complex persuaded client to plan the construction of a water treatment plant with capacity of 500 litr/s. Water transmission from Rafsanjan Shur River was executed by a diversion dam and related treatment system. This J.V was responsible for design, construction, operation and maintenance of all related civil and electromechanical works which fulfilled client satisfaction.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: EPC Contractor as member of Parhoon Tarh-Tool Gostar-Alfasam J.V.
Client: National Iranian Copper Industries co.
Consultant Engineer: Jooyabnou Consulting Engineers
Location: Iran-Kerman Province
Project Cost: 15 million USD
Project Duration: 36 months

 

Featured Images

Project Volumes

Concrete Volume: 16,000 m3
Formwork: 38,000 m2
Earth Works: 90,000 m3

Project Specification

Capacity of WTP: 500 litr/s
Pumping Station: 2 units
Pipeline: 5 km (600 mm diam.)
Diversion Dam: 3 m Height & 25 m width

Project Goals

  • Environmental protection
  • Supplement of industrial water through treatment of Shur river water and industrial waste water

Project Stakeholders

post

Almar Afghanistan

Almaar Afghanistan

The contract of Almaar dam and irrigation network designing was signed in 2012 between Tedis company of Tajikistan (main contractor) and Arian Parhoon. Almaar project is 34 kilometers far Maimana city, Faryab province, Afghanistan. The project includes a 68-meter-high concrete gravity dam and irrigation network in an area of 4000 hectares.


Status of Project: Completed

Project Highlights

Role of Parhoon Tarh: Main Contractor
Owner: Ministry of Water and Power in the Islamic Republic of Afghanistan
Client: Tedis (Tajikistan)
Location: Afghanistan, Faryab, Maimana
Project Cost: 1.55 million USD
Project Duration: 22 Months

 

Featured Images

Project Specification

Type of Dam: Gravity Dam
Length at the Crown: 350 m
Spillway: Free Spillway at the Crown
Drainage Network: 3995 Hectares

Project Goals

  • Providing water for downstream lands

Project Stakeholders